🇮🇷 Iran Proxy | https://www.wikipedia.org/wiki/Solid_Support_Ship
Jump to content

Fleet solid support ship

From Wikipedia, the free encyclopedia
(Redirected from Solid Support Ship)

A fleet solid support ship is a type of Royal Fleet Auxiliary (RFA) ship designed to supply solids (otherwise known as dry stores), such as ammunition, explosives and food, to Royal Navy ships at sea. The term can also refer to the programme to replace the RFA's existing solid support ships, the Fleet Solid Support Ship Programme.[1]

Current ships

[edit]
RFA Fort Victoria

The Royal Fleet Auxiliary currently operates one solid support ship: the Fort Victoria class, combined fleet stores ship and tanker, RFA Fort Victoria.

RFA Fort Rosalie

By 2021, the Fort Rosalie-class replenishment ships, (Fort Austin and Fort Rosalie), had been retired. Only RFA Fort Victoria had undergone a refit to enable her to supply the Royal Navy's new Queen Elizabeth-class aircraft carriers with solid stores.[2][3] With incompatible rigs, Fort Rosalie and Fort Austin were placed in extended readiness and were later sold to the Egyptian Navy.[4][5]

A programme to replace these ships, named the Military Afloat Reach and Sustainability (MARS) Fleet Solid Support (FSS), commenced in 2017, but was delayed in 2019.[1] In May 2021, the competition was restarted to select a design within two years.

Future ships

[edit]
A Fleet Solid Support Ship (FSS) concept

The advent of the Queen Elizabeth-class aircraft carriers necessitated the development of a new class of solid support vessels to succeed the current, outdated, and incompatible Fort Rosalie-class replenishment ships. [6] The Strategic Defence and Security Review 2015 affirmed the acquisition of three new large solid support vessels for the Royal Fleet Auxiliary (RFA) as a component of the Military Afloat Reach and Sustainability (MARS) Fleet Solid Support (FSS) initiative. In February 2019, Rear Admiral Paul Marshall was designated as the Senior Responsible Officer for this project. [7]

The National Shipbuilding Strategy (NSS), which was published in September 2017, mandated that the design and construction of these vessels would undergo an international competition, allowing UK companies to compete with foreign firms to foster competitiveness.[1] Designated as "non-warships", these vessels were mandated to be tendered on an international basis in accordance with Article 346 of the Treaty on the Functioning of the European Union (TFEU).[8][1][9] This faced resistance from various political parties, notably the Labour and the Scottish National Party, along with trade unions like GMB and the Confederation of Shipbuilding and Engineering Unions. They expressed concerns regarding the possible job losses for British shipyards. Their suggestion was to reclassify the ships as "warships", thereby exempting them from the treaty and permitting their construction in British shipyards.[7] Sir John Parker, a businessman whose recommendations laid the groundwork for the National Shipbuilding Strategy, also expressed criticism of the government's strategy, deeming it "not the right strategic approach". He further suggested that "competition limited to the UK should be contemplated for future vessels funded by defense."[10]

In 2018, a contract notice was placed for two solid support ships, with a probable option of a third later. The ships required a total cargo capacity of up to 7,000 m3 (250,000 cu ft), the ability to travel at a sustained speed of 18 knots (33 km/h; 21 mph) without resupply, the capability of delivering non-bulk logistic material whilst underway at 12 knots (22 km/h; 14 mph) and transfer single loads of up to 5 tonnes (4.9 long tons; 5.5 short tons).[11] A list of bidders was subsequently selected with a British consortium consisting of Babcock, BAE Systems, Cammell Laird and Rolls-Royce, as well as international bidders consisting of Fincantieri (Italy), Navantia (Spain), Japan Marine United Corporation (Japan) and Daewoo Shipbuilding and Marine Engineering (DSME) (South Korea).[12] Fincantieri and DSME later withdrew from the bid, however Fincantieri later rejoined.[13][14]

On 5 November 2019, the competition was suspended to ensure "requirements could be met" and a "value for money solution found", which raised hope from trade unions that the competition could be restarted and involve only UK shipyards.[15][8]

On 21 September 2020, Secretary of State for Defence, Ben Wallace, stated the vessels were "warships", effectively confirming they would be built in the United Kingdom.[16][17] On 21 October 2020, it was announced that the competition for the FSS would be re-started in Spring 2021,[18] covering three ships and it will be an international competition but the team must be a led by a British company.[19] In May 2021 the competition to build the ships was relaunched with the aim of taking a decision within two years.[20] In July 2022, Rear-Admiral Paul Marshall, the Senior Responsible Officer for the Fleet Solid Support ship project, told the House of Commons Defence Select Committee that the first ship was envisaged for service entry in 2028 with the third entering service by 2032.[21] In November 2022 it was announced that Team Resolute (BMT, Harland & Wolff and Navantia) had been selected to build the ships with the start of construction anticipated in 2025. [22] The manufacturing contract, with a value of £1.6 billion, was signed in January 2023.[23] It was subsequently indicated by the Ministry of Defence that the first ship's operational availability would now not be until 2031.[24]

The Team Resolute design envisages a vessel about 216 metres (708 ft 8 in) in length with three replenishment-at-sea rigs and possessing about 9,000 square metres (97,000 sq ft) of cargo space. The ship hangars will have the capacity to support two Merlin helicopters as well as unmanned aerial vehicles. Vessel speed is envisaged at 19 knots (35 km/h; 22 mph).[25]

In December 2025, it was revealed at the steel-cutting ceremony for the initial vessel of the three that the first ship would be designated as RFA Resurgent.[26] The subsequent vessels are allegedly to be designated as RFA Resource and RFA Regent, respectively, but with RFA Reliant another potential option.[27]

See also

[edit]
  • Tide-class tanker - replenishment tankers which are also part of the Military Afloat Reach and Sustainability (MARS) programme.

References

[edit]
  1. ^ a b c d "National Shipbuilding Strategy: The Future of Naval Shipbuilding in the UK" (PDF). gov.uk. UK Government. Retrieved 22 September 2020.
  2. ^ "Fleet Solid Support Ships". questions-statements.parliament.uk. UK Hansard. 20 October 2020. Retrieved 21 October 2020. The Royal Fleet Auxiliary currently has one Fleet Solid Support ship capable of supporting a Carrier Strike Group; RFA Fort Victoria.
  3. ^ "RFA Fort Victoria modified to support the aircraft carriers". Save the Royal Navy. 14 May 2018. Retrieved 22 September 2020.
  4. ^ "UK sells Royal Navy ships to Egypt for first time in 30 years". 29 October 2021.
  5. ^ "Notice of the potential sale of the former RFA Austin and RFA Rosalie for recycling only". Gov.uk. 21 May 2021. Retrieved 24 May 2021.
  6. ^ Tovey, Alan (19 April 2018). "Fears grow new ships to support Royal Navy will be built overseas". Daily Telegraph. Retrieved 11 May 2018.
  7. ^ a b "Appointment as Senior Responsible Officer Fleet Solid Support (FSS) programme" (PDF). gov.uk. 25 February 2019.
  8. ^ a b Chuter, Andrew (7 May 2020). "Britain to restart competition for fleet solid support ships, but who's allowed to bid?". DefenseNews. Retrieved 22 September 2020.
  9. ^ "Fleet Solid Support Ships" (PDF). House of Commons Library.
  10. ^ Allison, Geoge (7 November 2019). "Government's own review backs campaign to build Fleet Solid Support Ships in UK". UK Defence Journal. Retrieved 22 September 2020.
  11. ^ "United Kingdom-Bristol: Cargo ships 2018/S 092-209939 Contract notice Supplies". Ted Tenders Electronic Daily. 16 May 2018.
  12. ^ "Shipbuilding firms chosen for Fleet Solid Support competition". gov.uk. 30 November 2018.
  13. ^ Pfeifer, Sylvia (20 May 2019). "Big shipbuilders pull out of £1bn MoD support-vessel shortlist". Financial Times. London. Retrieved 20 May 2019.
  14. ^ Chuter, Andrew; Kington, Tom (31 May 2019). "In or out? Here's why Fincantieri may rejoin bidding to build British ships". Defense News. Retrieved 31 May 2019.
  15. ^ Hollinger, Peggy (5 November 2019). "MoD halts £1bn international tender for support ships". Financial Times. Retrieved 22 September 2020.
  16. ^ "House of Commons Hansard: Topical Questions - 21 September 2020 Volume 680". UK Parliament. 21 September 2020. Retrieved 22 September 2020.
  17. ^ "UK Government u-turns on Fleet Solid Support Ship designation". Naval Technology. 22 September 2020. Retrieved 22 September 2020.
  18. ^ "Fleet Solid Support ship competition to resume in Spring". UK Defence Journal. 2 March 2021. Retrieved 4 March 2021.
  19. ^ "UK shipbuilding boosted by warship procurement". UK Ministry of Defence. London. 21 October 2020. Retrieved 21 October 2020.
  20. ^ "Competition for three Fleet Solid Support ships launched". UK Defence Journal. 21 May 2021.
  21. ^ "Royal Navy changes course on interim anti-ship missile for a second time". Navy Lookout. 6 July 2022.
  22. ^ "Team Resolute Wins Contract To Build Royal Navy's FSS Ships". Naval News. 16 November 2022. Retrieved 2 December 2022.
  23. ^ "UK MoD Signs Contract With Team Resolute For 3 Logistic Ships For The Royal Navy". Naval News. 18 January 2023. Retrieved 19 January 2023.
  24. ^ "Fleet Solid Support Ships: Procurement Ministry of Defence written question – answered on 27 June 2023". They Work for you. 27 June 2023.
  25. ^ "Team Resolute selected as preferred bidder to build the Fleet Solid Support Ships". Navy Lookout. 16 November 2022. Retrieved 2 December 2022.
  26. ^ "UK cuts steel on new support ship as RFA Resurgent is named". ukdefencejournal.org.uk. 3 December 2025. Retrieved 3 December 2025.
  27. ^ "Steel cut for RFA Resurgent, the first Fleet Solid Support ship - Navy Lookout". navylookout.com. 3 December 2025. Retrieved 3 December 2025.